Method statement of vinyl sheet
14/07/20
Comment
LONLEUM INSTALLATION SPECIFICATIONS
1. LONLEUM
LONSEUM is a resilient flooring especially formulated of PVC resins (PolyVinyl Chloride) and has the following structure and specifications.
1 - 1. STRUCTURE
(Fig - 1)
________________________
________________________
........................................................
........................................................
........................................................)
}-------
-------Wear Layer
Medium Layer
Backing
Overall Thinkness0.4 mm
1.6 mm
2.0 mm
0.4 mm
2.1 mm
2.5 mm
Weaw Layer: This Layer is blended much of PVC resin so that it may with may withstands abrasion and water as well as chemicals. Medium Layer: This Layer is blended relatively much of inoraganic filler, so as to provide a good dimensional stability.
Backing: Backing cloth ensures extra-good installation adhesion and further improves dimensional.
Click here to download the full text